Engineer
- Services à la personne Responsible for the electric maintenance plans and troubleshooting of the Passenger wagons and electric generator:
- Solved issues regarding the burning of electronic components of the passenger train audio system
- Solved power outages in six electric generator wagons by redesigning the electrical cabinets layout
- Reduction in time of electrical preventive maintenance of Passenger Wagons from 3 to 1.5 days
- Solved power outages in Fifty wagons by redesigning the electrical cabinets
- Designed a new LED display with RS485 communications to work with the Passenger Information System (PIS)
- Redesigned the Hydrophore system to improve reliability of the toilets in the passenger train